Aug 9, 2022 ... Production line applications for robots have historically been repetitive, from the first industrial robot systems that appeared on General ...
Jun 28, 2022 ... In recent years, manufacturing has been one of the first industries to deploy robots on a large scale, since industrial robotics serve to ...
In this industrial robot, the body has two parts extending with the first axis to be shaped like a fork and swingably supports the swinging element by ...
To perform such safety functions the robot comprises in a joint connecting two robot arm sections a first position sensor (132) for sensing the angular ...
Jun 2, 2011 ... An industrial robot includes a joint, a first arm rotatably connected to the joint about a first rotation axis and defining a hollow portion ...
The second wrist power transmission part includes a hypoid gear set, a drive shaft, a first reduction gear part reducing a speed of rotation from the second ...
The robot arm comprises e.g. a first and a second arm part and also a wrist arranged with a tool attachment. The arm in its initial position/rest position is ...
This was one of the earliest industrial machines to replicate the work of a human cotton spinner. It was effectively the first industrial robot. A robot ...
In a serial kinematic system of the industrial robot 1, this is followed by a second link 12, on which a first camera 21 is mounted, a third link 13, on which a ...
A method for detecting a fault in a robot joint includes the steps of: performing a first torque measurement at the robot joint to thereby obtain a first ...
OAK Camera Line Creators Launch Kickstarter Campaign to Develop Open Source Robot for Everyone: rae. 11/09/22, 07:38 AM | Industrial Robotics, Mobile Robots.
Basic Info. The very first industrial robot, the Unimate was conceived from a design for a mechanical arm patentes in 1954 by American Inventor George Devol, ...
the hypoid gear 50 in the first hypoid gearing is supported on its outside by a needle thrust bearing 86 and a taper roller bearing 88 in the lower fork arm 14.
... robot system. The method can include moving a first part of said tool and a cross beam sensor by said industrial robot; recording a first posture and a ...
The industrial robot according to claim 8 , wherein the gap between the first connecting member and the cable passing hole is seal treated by the sealing ...
An industrial robot including a first robot part and a second robot part arranged to be moved in relation to each other. A balancing device is arranged ...
A first power transmission mechanism (I) for transmitting a driving force of the first motor to the second wrist portion includes a pair of first hypoid gears ( ...
Aug 6, 2021 ... The first will enable personnel located anywhere to remotely view what the Sarcos robots “are seeing.” Tele-operational capabilities will be ...
A cable drawn from a lower arm of a robot into a first upper arm part of an upper arm is further drawn out to an exterior space of the robot through a first ...